OperoNMS demo guide From an empty account to a grafted batch
Profile tabs:PhasesSeasonal TimingHarvest & YieldOperationsMaterialsGrower's NotesActuals Feedback
Module guide: Production Profiles

Operations

What is done in each phase, and when. Plus the quality checks.

What it is

One block per phase, showing its growing environment. Each block lists the operations (jobs) for that phase and, underneath, its quality checks.

The operations of one phase
The operations of one phase
  1. 1The phase and its environment.
  2. 2Operation: what is done, for example “Record the rootstock graft and its take”.
  3. 3When: Once, at phase start or Every week of phase.
  4. 4Remove deletes the operation (draft only).
  5. 5+ Add operation adds a new line named “New operation”.
Adding an operation
Adding an operation
  1. 1Type the operation's name.
  2. 2Choose When: here “Every week of phase” for a weekly dark-room check.
  3. 3+ Add operation again for more.

Quality checks

Quality checks under a phase
Quality checks under a phase
  1. 1Quality checks sit under the operations of the phase.
  2. 2Code: a short ID, unique within the phase.
  3. 3Type: Visual, Pass / fail, Numeric or Measurement.
  4. 4When: at phase start, during the phase, or at phase end.
  5. 5Required: tick if it must always be done.
  6. 6Min / Max: the accepted range, for Numeric and Measurement checks only.
  7. 7Unit: needed for a Measurement check.
  8. 8+ Add check adds a line (code QC1, QC2…, named “New check”).
Measurement checks need a unit. A Measurement check must have a unit (for example mm), and any other type of check must not have one. For a simple range check you can also use Numeric with min and max, and put the unit in the name, as in “Scion shoot length (mm)”.

What it means and how it is used

Common mistakes

Try it

OperoNMS demo guide. Every name, code and figure in the pictures is invented for training.